Case details
Our featured projects showcase expert craftsmanship and strategic execution from concept to completion.
Force Protection
Mission-Ready Security Solutions Delivered with Precision and Reliability
As a trusted partner to U.S. government operations in Iraq, Top Way was contracted to design, construct, and fully implement Force Protection Infrastructure in support of Department of Defense (DoD) personnel and assets. This project involved the creation of a fully secured operating zone in a high-risk area, incorporating all key defense elements necessary to meet stringent military-grade safety and operational standards.
Scope of Work
The force protection assignment encompassed comprehensive site hardening and physical security construction. Top Way’s responsibilities included:
Perimeter Fortification: Installation of high-grade T-wall concrete barriers and blast-resistant fencing forming a complete boundary to protect against external threats.
Watch Towers: Design and erection of elevated guard towers with reinforced bases, providing 360-degree surveillance capabilities across the secure area.
Sandbag Reinforcement Systems: Strategic placement of sandbag walls and berms for additional blast mitigation and rapid-response coverage.
Secure Entry Control Points (ECPs): Construction of controlled access gates with vehicle barriers and security checkpoints, supporting personnel screening and movement control.
Lighting and Surveillance Infrastructure: Deployment of high-intensity floodlights, thermal cameras, and CCTV systems to enable day and night surveillance and deterrence.
Bunkers and Blast-Resistant Shelters: On-site construction of protective shelters capable of withstanding indirect fire and explosive threats.
Site Clearance and Grading: Ground preparation to enable clear visibility zones, rapid troop movement, and obstacle-free response routes.
Self-Performed Construction by Top Way Teams
What distinguishes this project is that all work was self-performed by Top Way, using our in-house engineering, logistics, and construction personnel — ensuring full control over quality, timelines, and operational integrity.
Civil Works: All excavation, concrete, and earthworks performed using Top Way equipment and crews.
Material Sourcing: Local procurement of Class-A materials compliant with U.S. DoD standards.
Project Management: Deployed certified project managers and safety officers to maintain alignment with military protocols and operational guidelines.
Safety Compliance: Full adherence to OSHA standards, along with internal SOPs tailored for mission-critical sites.
Timeline & Execution
Operating under strict time constraints and elevated security protocols, Top Way mobilized rapidly and delivered the project ahead of schedule. With continuous coordination with DoD liaisons and on-site command personnel, we ensured:
Minimal disruption to active operational zones
Full compliance with classified security procedures
Zero safety incidents throughout the duration of the project
Strategic Impact
The success of this force protection initiative reinforced Top Way’s reputation as a mission-capable contractor for U.S. government entities operating in complex environments. The delivered infrastructure is now actively used to:
Secure military and contractor personnel
Protect critical equipment and logistics hubs
Enable rapid response to threat conditions
Maintain high readiness and control at the installation
Why Top Way Was Selected
✔ Proven track record supporting defense and government contracts
✔ In-house capacity for rapid mobilization in volatile areas
✔ Deep knowledge of local regulations, terrain, and security needs
✔ Commitment to U.S. military standards and values
✔ Transparent reporting and communication at every project stage